Crocodile Pit
Task: Group members must construct a bridge over a stretch of ground approximately eight feet wide. The deck of the bridge must rest above the beginning and ending lines, which are suspended six to eight inches above the ground. All group members must cross over the bridge and pass under a finish line suspended about four feet above the ground. Available construction equipment include two milk crates, a 2” x 12” plank eight feet long, another 2” x 12” board four feet long, a 2” x 4” board four feet long, and a broom handle. Once everyone has crossed under the finish line, the bridge must be dismantled and brought across as well.
For more information on ropes courses
For examples of our most current ropes course designs and products, download our challenge course services catalog or call us at (734) 971-7470.
DOWNLOAD a Challenge Course Services Catalog
|